Friday, November 6, 2009

Not much planned for this week on the condo due to the wedding.

Current to do list:

***indicates boyfriend project, or boyfriend and his daddy project/ Contractor/Can’t do by myself.


General:
• Plummer coming Tuesday Morning
• Floors scheduled for installation the 16th (Tile in entry way, laundry room, & Bathroom) & 17th (carpet)
• Finish all changes to cabinet design for kitchen so I can order it. - Sunday at 1:00pm

Small Closet:
• Measure for a new closet mirrored door. This Weekend
• ***install new mirrored closet door (after baseboards).

Bathroom
• *** Install the countertop and new sink fixtures
• Bring extra cabinet down to Neighbor This Weekend
• Buy over the toilet storage counter
• Paint/BUY the baseboards
• ***Put in the new door trim
• ***Put in the baseboards
• Cover the nails in the baseboards
• Sand the baseboards
• Touch up paint on the baseboards
• Put in the new door stopper

Bedroom:
• ***Look at the sliding doors leading out to the patio… replace or fix.
• Custom plantation shutters.

Living Room:
• ***Install door trim
• Paint/Buy baseboards
• ***Install baseboards
• Cover the nails in the baseboards
• Sand the baseboards
• Touch up paint on the baseboards
• Find wall A/C unit and buy.
• Submit paperwork for it to be installed.
• ***Install A/C Unit
• ***Fix the sliding Glass doors/replace
• New patio screen door.
• Custom plantation shutters for the sliding glass doors.

Entry Way
• Buy decorative trim
• Paint decorative trim
• ***Install decorative trim
• ***Put new door trim on.
• ***Install baseboards
• Cover the nails in the baseboards
• Sand the baseboards
• Touch up paint on the baseboards

Dining Room
• Touch up the ceiling
• ***Install baseboards
• Cover the nails in the baseboards
• Sand the baseboards
• Touch up paint on the baseboards

Utility closet:
• Paint the closet
• Paint the shelves
• Paint ceiling
• Figure out a way to put a door up to close the washer/dry from view.
• ***Install baseboards
• Cover the nails in the baseboards
• Sand the baseboards
• Touch up paint on the baseboards

Kitchen:
• ***Remove the rest of the cabinetry that needs removal.
• Finish Painting walls This Weekend
• Buy a new microwave to have installed after cabinets.
• Order new kitchen cabinets. (wait 3-4 weeks for delivery)
• Order granite countertops and knobs for doors (after cabinets are installed).
• ***Put in new floor. (December)
• ***Install baseboards
• Cover the nails in the baseboards
• Sand the baseboards
• Touch up paint on the baseboards

MOVE ALL MY STUFF IN AND PARTY!